New bricks were required to replace old hand made bricks at a local school.
We identified that the job required an old Tonbridge hand made brick.
The new version of these made at Ashdown works are much lighter and costs in excess of £1 a brick.
The contractor couldn't wait for more than 16 weeks, but was more than happy with the Dutch import we found, added to which, the choice of brick saved them more than £3000!
We identified that the job required an old Tonbridge hand made brick.
The new version of these made at Ashdown works are much lighter and costs in excess of £1 a brick.
The contractor couldn't wait for more than 16 weeks, but was more than happy with the Dutch import we found, added to which, the choice of brick saved them more than £3000!